System integration

System integration
from procurement to on-site operations

Networks rarely arrive on their own. Cabling, equipment, audio-visual, endpoint IT and the people who keep it running usually land in the same project — and splitting them across vendors is where schedules slip.

15 yrsTeam track record since 2010
~1 weekTypical site delivery
99%+Fulfilment on long-running accounts
24/7NOC monitoring
Capabilities

What this service covers

Hardware procurement

Equipment sourcing, configuration and commissioning as a single line item rather than a separate purchasing exercise.

Information security

Security hardening and monitoring aligned with the network design instead of bolted on afterwards.

DR and business continuity

Business-continuity planning with recovery objectives, failover mechanisms and drill requirements defined up front.

ELV and AV framework services

Structured cabling, network equipment and conference audio-visual delivered together — no vendor hand-offs mid-project.

On-site operations

Engineers stationed at your site, familiar with the environment and business rhythm.

Store-opening kit

Switch, router, wireless and IP phone as one delivery unit for fast retail rollouts.

Typical scenarios

Who uses it, and for what

Corporate real estate

New offices and fit-outs

  • ELV and AV delivered as one package, about 1 week
  • Consistent design standards across locations
  • Multiple sites delivered in parallel
  • Framework agreements avoid tendering every project
Manufacturing

Plants and production IT

  • Network, ELV and AV commissioned together
  • Production systems on deterministic transport
  • On-site engineers scheduled per project
  • 24/7 NOC monitoring with proactive alerting
Retail and F&B

Store rollouts

  • Store-opening kit, about 1 week per site
  • Endpoint IT for retail and F&B, 5,000+ users served
  • Standardised equipment and configuration templates
  • Localised response through regional service coverage
Large enterprises

Long-running managed service

  • On-site operations running since 2015 for a listed automotive multinational
  • 100% VIP fault tracking with root-cause closure
  • Overall service fulfilment above 99% on that account
  • MLPS, ISO 27001 and ISO 9001 certified
Specifications

Service parameters at a glance

These are network-wide figures. Anything that depends on a specific site — facility conditions, access method, exact schedule — is confirmed by survey.

Fredyun Network · System integration
ItemSpecification
ScopeHardware procurement · information security · DR and business continuity · RPA · ELV and AV framework services · on-site operations · store-opening kits
Lead timeELV and AV works about 1 week; store-opening kit about 1 week per site; multiple sites delivered in parallel
On-site operationsScheduled per project, backed by 24/7 NOC monitoring and proactive alerting; 100% VIP fault tracking
Delivery processFive standardised stages: requirements and assessment → solution design → provisioning → testing and acceptance → operations and assurance
CertificationChina Multi-Level Protection Scheme (MLPS) plus ISO 27001 and ISO 9001
BillingItemised as hardware schedule + implementation person-days + managed service fee; one-off costs (equipment, works, installation labour) listed separately
Bandwidth10 Mbps – 100 Gbps, upgradable in steps
Service assurancePoP-to-upstream-ISP availability 99.99%; end-to-end link availability 99.5%; 24/7 NOC monitoring and proactive alerting; 100% VIP fault tracking
Contract termFlexible — no blanket minimum. Annual terms for steady services; short-term needs (events, exhibitions, temporary projects) from one day
Footprint60+ PoPs across Greater China, 120+ PoPs worldwide; measured latency between nodes is queryable on the coverage map

How to think about it

Five delivery stages, every project. Requirements and assessment (survey, capacity and latency evaluation, feasibility analysis); solution design and planning (topology, routing, SLA and BCP design, T&Cs and milestones); provisioning and deployment (circuits, CPE, SD-WAN orchestration, parallel multi-site delivery); testing and acceptance (end-to-end validation, performance testing, KPI/SLA sign-off then cutover); operations and assurance (24/7 NOC, proactive alerting, visual portal).

Why the first stage matters most. Surveys are the step most often compressed because they produce no visible output. Skipping them is why projects discover, at acceptance, that some interface nobody remembered depends on a circuit that was decommissioned. Fredyun front-loads it deliberately.

Framework agreements. For organisations opening sites continuously, tendering each project separately costs more in elapsed time than it saves in price. Fredyun runs multi-year framework agreements — a listed internet company has a three-year ELV and AV framework covering mainland China — so new sites start under agreed terms immediately.

Licence scope

International and Hong Kong / Macau / Taiwan capacity is not built by Fredyun. China Mobile International (CMI), China Unicom Global (CUG) and China Telecom Global (CTG) hold the international telecom licences and supply the underlying circuits. Fredyun procures that licensed capacity and delivers convergence, routing, end-to-end provisioning and operations on top of it.

Fredyun itself holds a trans-regional value-added telecom business licence (B1-20235481) issued by China's Ministry of Industry and Information Technology, covering IDC, ISP, CDN and domestic internet VPN — trans-regional, not international. This boundary is stated explicitly in every proposal and contract.

FAQ

What clients ask most

Can network and cabling be delivered together?

Yes — that is what the ELV and AV framework service covers: structured cabling, switching and routing, wireless, IP telephony and conference audio-visual delivered as one package, typically about 1 week. Where circuits or corporate-network onboarding are needed at the same time, they are scheduled alongside so you do not get two crews arriving weeks apart.

Do you provide on-site engineers?

Yes. On-site operations means engineers stationed at your premises who know the environment and the business rhythm, so incidents do not start with re-establishing context. Fredyun has run this model for a listed automotive multinational since 2015, with 100% VIP fault tracking and overall service fulfilment above 99% on that account.

Can we work under a framework agreement?

Yes. Multi-year framework agreements let new sites start under agreed terms without a fresh tender — a listed internet company runs a three-year ELV and AV framework with Fredyun covering mainland China. Scope, rate cards and response commitments are fixed once and reused.

How is integration work priced?

Itemised: hardware schedule + implementation person-days + managed service fee. One-off costs such as equipment purchase, construction works and installation labour are listed separately in the proposal, so you can see what is capital and what is recurring. Final pricing follows the formal proposal and contract.

Need a link assessment for this design?

Tell us the site locations, bandwidth and latency targets
and we will come back with a workable topology and SLA proposal.